| Modifications: |
Removed:
AIS "pump" (04-07-2007)
Removed Water Heater (SuperBowl Sunday)
Removed rear pillion pad
Removed "bicycle" reflectors
___________________________________________________ Added:
- Relocated FPR under tank
- ISO Grips (01-20-2008)
- Right-side cleanup (08-18-2007)
- adding new "cover" soon...
- Left-side cleanup (08-18-2007)
- Braided stainless fuel line
- NAPA stainless dry break
- Welded dry break "holder" to motor mount (01-26-2008)
- Mount painted w/black wrinkle finish (01-27-2008)
- Back on bike, dry break velcro'd into holder (02-03-2008)
- Akitadog coil relocate plate (04-07-2007)
- Homemade BAK (04-07-2007)
- AIS block-off, Barons (04-07-2007)
- Formed rear brake reservoir braket from aluminum bar stock (03-24-2007)
- PC-III (SuperBowl Sunday 2007)
- Black PCS Monster Pro pipe (SuperBowl Sunday 2007)
- Trimmed stock license plate bracket
- Fabricated custom license plate frame w/LEDs
- Added tool bag behind seat
___________________________________________________
Planned Mods:
- Wrap-around flexible LED front turn signals
|